
Integration Objects
TunisiePublication : 6 nov. 2026
Development of an ICSS for an Oil Production Unit
- Stage
- 4-6 mois
- Hybride
- Échéance : 19 nov. 2026
- Industrial automation and control
- ICSS
- Industrial IT / SCADA
- Advanced Process Control
- Control and Safety Systems
Description du poste
Department
Automation department — PFE 2026–2027
Project
Design and develop an Integrated Control and Safety System (ICSS) for a new oil production facility, managing process automation, emergency shutdown (ESD) and safety protocols.
Main topics
- Research automation architectures and industrial communication protocols such as OPC and Modbus.
- Analyze engineering design input packages and Cause & Effect matrices.
- Design the ICSS network topology and general system architecture.
- Engineer control and safety cabinets, wiring schematics and network diagrams.
- Develop control logic, ESD safety sequences and SCADA/HMI supervisory screens.
- Perform system integration tests and internal deployment validation.
Keywords
ICSS, PCS, ESD, F&G, Cause & Effect, HMI, SCADA, OPC, Modbus.