
Integration Objects
TunisiePublication : 6 nov. 2026
Study and Design of a Telemetry and Surveillance System for a Gas Pipeline
- Stage
- 4-6 mois
- Hybride
- Échéance : 19 nov. 2026
- Industrial automation and control
- OpenTelemetry
- Drone surveillance
- Pipeline Systems
Description du poste
Department
Automation department — PFE 2026–2027
Project
Study and design of a telemetry and surveillance system for a gas pipeline.
Keywords
Telemetry, surveillance, gas pipeline.