
Bako Motors
Ben ArousPublication : 21 nov. 2026
Optimization of Standard Operating Times for the BEE/B-VAN Production Line
- Stage
- 4-6 mois
- Hybride
- Échéance : 5 déc. 2026
- Formal Methods
- Industrial engineering and methods
- Cycle-time analysis
- Lean manufacturing / Continuous improvement
Description du poste
Department
Methods
Project objectives
Optimize standard operating times for the BEE/B-VAN production line through cycle-time analysis and waste elimination.
Application
Apply with the reference Subject 19 and include your CV.