
Bako Motors
Ben ArousPublication : 21 nov. 2026
Optimization of Procurement Policies and Control of Raw Material Inventory Levels
- Stage
- 4-6 mois
- Hybride
- Échéance : 5 déc. 2026
- Healthcare supply chain
- Procurement Risk
- Supply chain and inventory management
- ABC analysis
Description du poste
Department
Supply chain
Project objectives
Analyze and optimize the procurement process through consumption analysis, ABC classification and the definition of replenishment parameters. The aim is to reduce stockout risks and inventory holding costs.
Application
Apply with the reference Subject 16 and include your CV.