WIC MIC GROUP (Washing & Manufacturing International Company)
Environmental Risk Assessment and Sustainable Management of Industrial Wastewater Treatment Sludge
- Stage
- 4-6 mois
- Hybride
- Échéance : 30 nov. 2026
- Sustainability and decarbonization
- Water and wastewater management
- Environmental / Environmental Engineering
- Circular economy / Sustainability
Description du poste
Overview
- Company: WICMIC Group
- Project reference: #08
- Date listed: NOVEMBRE - 2026
Project objectives
Characterize industrial wastewater treatment sludge, identify associated environmental risks, assess treatment and recovery options, compare technical and economic solutions, and develop a sustainable sludge management strategy.
Expected deliverables
- Characterization of industrial wastewater treatment sludge.
- Identification of associated environmental risks.
- Assessment of treatment and recovery options.
- Comparative analysis of technical and economic solutions.
- A sustainable sludge management strategy.
Context and scope
This PFE focuses on assessing and proposing sustainable solutions for the management of sludge produced by industrial wastewater treatment within the textile/denim manufacturing context. Work will likely include laboratory or literature-based characterization, risk assessment, evaluation of treatment/recovery technologies, and development of an implementation strategy considering technical and economic factors.
Recommended methods / techniques (implied by objectives)
- Sludge sampling and characterization techniques (physical, chemical, possibly ecotoxicological parameters).
- Risk assessment methods for environmental impacts.
- Techno-economic comparison of treatment and recovery options.
- Strategy development for sustainable management (circular economy approaches when relevant).
Candidate profile / prerequisites
- Final-year engineering student (PFE) in environmental engineering, chemical engineering, wastewater treatment, or related fields.
- Familiarity with wastewater treatment processes and environmental impact assessment is desirable.
Duration
- Default PFE duration: 4-6 months.
Application details (instructions retained from source)
- Required application documents: CV.
- Deadline (from PFE book/LinkedIn post): 15/12/2026.
(Do not include the application email in the description; use the separate application_email field.)