Abstract: Design a remote telemetry and monitoring system to acquire pipeline data across long distances and enable centralized real‑time supervision from a dispatching center.
Deliverables / scope:
- Research long‑range telemetry standards and protocols (DNP3, OPC, Modbus, etc.)
- Analyze engineering design input packages
- Architect the SCADA supervisory system, network topology and telemetry backbone
- Configure RTU communication protocols
- Engineer control cabinets, wiring diagrams, loop drawings and process control logic
- Develop SCADA/HMI synoptics
- Perform system integration testing