JFK Integration
TunisiePublication : 11 nov. 2026
Automated Vision-to-Perspective Migration Tool for Ignition
- Stage
- 4-6 mois
- Hybride
- Échéance : 23 nov. 2026
- Artificial intelligence and technology transformation
- Software Migration
- Ignition
- Vision 3D
- Perspective
- Industrial automation and intralogistics
Description du poste
Objective
Develop a tool that automatically converts Ignition Vision projects into Perspective projects. The tool will parse Vision windows, templates, bindings and scripts, map them to their Perspective equivalents, and flag elements requiring manual rework. It will be tested internally on real projects to measure conversion accuracy and time savings compared with manual migration.
Scope
- Study Vision and Perspective project structures.
- Parse Vision windows, templates, bindings and scripts.
- Map components to their Perspective equivalents.
- Flag anything requiring manual rework.
- Generate a report of converted items and items needing rework.
- Test the tool on real projects and measure accuracy and time saved versus manual migration.
Technologies and keywords
Ignition, Vision, Perspective, Migration, AI.
Position details
Engineering internship; 1 intern; end-of-studies project lasting 4–6 months.