
Integration Objects
TunisiaPublished: 6 Nov 2026
Study and Design of a Water Station Control System
- Internship
- 4-6 months
- Hybrid
- Deadline: 19 Nov 2026
- Industrial automation and control
- Water Systems
- Control systems engineering
- SIOTH UHMI
Job description
Department
Automation department — PFE 2026–2027
Project
Study and design a control system for a water station.
Keywords
Modbus, DCS, OPC, HMI.