
Bako Motors
Ben ArousPublished: 21 Nov 2026
Optimization of Standard Operating Times for the BEE/B-VAN Production Line
- Internship
- 4-6 months
- Hybrid
- Deadline: 5 Dec 2026
- Formal Methods
- Industrial engineering and methods
- Cycle-time analysis
- Lean manufacturing / Continuous improvement
Job description
Department
Methods
Project objectives
Optimize standard operating times for the BEE/B-VAN production line through cycle-time analysis and waste elimination.
Application
Apply with the reference Subject 19 and include your CV.