• Hi Interns
Main
  • My Space
  • My Space
  • Offers
  • Profile
  • Hi Academy
  • Monthly Check-Up
  • LeaderboardNew
Tools
  • Hi Resume
  • Hi Resume
  • PDF to Hi Resume
  • AI Outreach
  • Tailored Resume
  • LinkedIn to Email
  • Interview sheet
  • PDF to Hi Resume
  • AI Outreach
  • Tailored Resume
  • LinkedIn to Email
  • Interview sheet
Coaching(Premium↗︎)
  • Career Consultant
  • Hi Agent
  • Career Consultant
  • Hi Agent
  • Upgrade to Premium
  • Premium / Plus
  • Pricing

 

Info session

Free

The method that gets interviews, live with the team.

  1. Offers
  2. Offer details
Sign in
Bako Motors

Bako Motors

Ben ArousTunisiaPublished: 21 Nov 2026

Optimization of Standard Operating Times for the BEE/B-VAN Production Line

  • Internship
  • 4-6 months
  • Hybrid
  • Deadline: 5 Dec 2026
  • Formal Methods
  • Industrial engineering and methods
  • Cycle-time analysis
  • Lean manufacturing / Continuous improvement

Job description

Department

Methods

Project objectives

Optimize standard operating times for the BEE/B-VAN production line through cycle-time analysis and waste elimination.

Application

Apply with the reference Subject 19 and include your CV.

Similar offers

  • Layout Design and Sizing of Production Equipment for a New Industrial FacilityBako Motors · Ben Arous · Stage
  • Optimization of Logistics Flows and Improvement of Inventory Management between Warehouses, Subcontractors, and the Production LineBako Motors · Ben Arous · Stage
  • STAGE - Amélioration performance industrielle fournisseur F/HSafran · France · Stage
  • ARQUUS ALTERNANCE - Ingénieur Data/BI Bac +4/5 (H/F)john cockerill · Bourgogne-Franche-Comté · Alternance
  • Supply Chain - REF SC 3 - Modélisation et management des Retro-PlanningsSafran Tunisie · Tunisie · Stage
  • Autonomous ERP Document Management and Approval Workflows #05WIC MIC GROUP (Washing & Manufacturing International Company) · Tunisie · Stage
  • Stages et emplois en production, qualité et HSE
  • Stages en Tunisie