• Hi Interns
Main
  • My Space
  • My Space
  • Offers
  • Profile
  • Hi Academy
  • Monthly Check-Up
Tools
  • Hi Resume
  • Hi Resume
  • PDF to Hi Resume
  • AI Outreach
  • Tailored Resume
  • LinkedIn to Email
  • Interview sheet
  • PDF to Hi Resume
  • AI Outreach
  • Tailored Resume
  • LinkedIn to Email
  • Interview sheet
Coaching
  • Career Consultant
  • Hi Agent
  • Career Consultant
  • Hi Agent
  • Upgrade to Premium
  • Premium / Plus
  • Pricing

 

Info session

Free

The method that gets interviews, live with the team.

  1. Offers
  2. Offer details
Sign in
SMECATRON

SMECATRON

TunisiaPublished: 13 Jan 2026

REF - P03 - Amélioration de la productivité et réduction des gaspillages

  • Internship
  • 4-6 months
  • On-site
  • Deadline: 27 Jan 2026
  • Génie industriel / Lean manufacturing
  • Génie mécanique productique
  • Logistique & Organisation Industrielle
  • Lean manufacturing / Industrial engineering
  • Amélioration de la productivité

Job description

Missions:

  • Réaliser un diagnostic global de la productivité des ateliers
  • Identifier les principales sources de gaspillage (temps, mouvements, attentes, stocks, rebuts)
  • Analyser les flux de production et l’organisation des postes de travail
  • Proposer et mettre en œuvre des actions d’amélioration: réorganisation des postes, optimisation des déplacements, amélioration du flux des pièces, réduction des temps non productifs
  • Mesurer les performances avant/après (temps, rendement, productivité)
  • Formaliser les résultats et proposer des pistes de pérennisation

Profil/Compétences:

  • Connaissances de base en génie industriel, mécanique ou production
  • Compréhension des notions de productivité et de gaspillages industriels
  • Notions de Lean Manufacturing
  • Rigueur, autonomie et sens de l’organisation